Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
1 | LCIK - 38852 |
TPU cover standardization for 6.5 inch displays |
Abhin Manra , 51009366 |
Shiv Shankar , 51010246 Pawan Kumar , 51009498 |
Mixing of TPU cover for increasing the capacity but causing defects like dent, peel off of paint, improper fitment. | Less modification in jigs platforms, non mixing of TPU covers online. Increase in UPH. | 08/2023 | ||
2 | LCIK - 39075 |
TPU Cover Management |
, 51010410 |
Ankur yadav , 51010078 PRATYUSH RAY , 167330 |
11/2023 | ||||
3 | LCIK - 37252 |
TP lcd room and toilet supply separation work |
Mukesh kumar arya , 51009476 |
Sharan Ojha , 59383 |
tp lcd room ahu fire damper and one toilet room supply was connected to same mcb due to which due to some electrical fault in toilet room supply was going off at all places | now. Supply has been given through a new circuit so that the damper of LCD room and AHU room does not stop again and again, due to which the production in the power system will not stop. | 11/2022 | ||
Previous 97 98 99 100 101 Next |