Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 40430 |
process improvement |
Sandeep Kumar , 51009771 |
Earlier we did not have any system to check part MPN. So for those MPN which was not in feeder sheet, we had to call or Msg NPI team & design team and we used to wait for their approval. | Now we have made a MES dashboard after discussing with NPI & design team. Now we can easily get the part MPN of all the parts in MES dashboard | 05/2024 | |||
| 2 | LCIK - 40942 |
Process improvement |
Sumit Kumar Maurya , 59428 |
Akbar Ali , 51010494 |
SMD Component shifted issue coming from SMT side which cause pad off during process and there as per defined SOP operator fix the middle cover bracket from left to right due to which shifted component hit with middle cover edge lock while fitment which got component pad off. | 1. To prevent this defect one PCR raised for process modification. 2. Process modified with previous process at SOP No. 31 “ First operator align the middle bracket from top right then sequential align with centre middle point after that carefully fix with PCBA from bottom left corner”. 3. For detection one checkpoint added at Process No. 30 stage before middle cover bracket fitment to intercept this issue on that stage. 4. For Component shifted notification shared with SMT team to short the previous lot of PCBA and keep separate the shifted issue. 5. Official notification shared with SMT superior to improve the material issue at that end. | 07/2024 | ||
| 3 | LCIK - 41710 |
Process improvement |
Sumit Kumar Maurya , 59428 |
1- SFG wires Components getting NG due to cavity crack issue- not accepted by vendor team for 2- Line was run after speaker cavity sorting by IQC team ( As per analysis Cavity 2 was ng) | >> Speaker fitment process was modified on line. >> Temporry checkpoint was added after spk cavity fitment stage to identified the ng rate of cavity Crack. >> Spk cavity crack issue feedback has given to vendor for material quality improvement . | 10/2024 | |||