Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 37861 |
Process Improvement |
SOMSHANKAR PATEL , 51009707 |
Vinod sapehia , 51008613 Janaki Ballav Pattanaik , 51009457 |
02/2023 | ||||
| 2 | LCIK - 41190 |
Process improvement |
Sumit Kumar Maurya , 59428 |
> During shift end during Reco filling process observed gap in the reco sheet. > Further tracking leads that all the A class material was short with QPS of 1 nos. > Key binding data was matched with battery scanning data and also with FVI and packing data to track the exact device. > Due to this all the production line concern are stay 4 hours more after shift end due to investigation process. | "> Require Metal detector machine on the security checkpoint just after Air shower room, So that no one will take any metal part in and out from the production floor. > Any metal item will pass after verification of security concern on the production floor. > Security supervisor will be present during operator checking after metal detector, So that no operator will communicate or make bond with the security concerns and material verification. > Rotation of security concern is necessary on daily basis. > Dummy should be taken of security concern to check their attentiveness towards checking. > Also require one security concern all the time to check operator before washroom when we have plan of smart phones. > Also require one more camera who will monitor operator activity in the washroom gang way. currently no camera will focus on the gang way area of washroom. > Cars should be checked for all the concerns during in and out. > No material should be moved without any valid document either its of smt or IQC team." | 08/2024 | |||
| 3 | LCIK - 37607 |
Process improvement |
Neeraj kumar , 81371 |
Anil kumar , 51009110 Suneel Kumar Sahu , 51009708 |
12/2022 | ||||