Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 36802 |
Process improvement |
Adarsh giri , 51009642 |
Before we keep one trey for stopping the handset at IMEI Stage. Due to this sometime handset insert below the trey. | now fixed permanent stopper. and no need to keep extra tray at this stage for stopping handset. | 08/2022 | |||
| 2 | LCIK - 42434 |
process improvement |
Sumit Kumar Maurya , 59428 |
"Cause 1: High battery cover rejection rate due to repair dismentaling rate was high in blaze X model due to glue outside issue was came on line - Ng rate was- 6% Cause 2: Battery cover paint peel off problem was occurred while cleaning glue from the battery cover." | ">> Glue machine has stabled after changed glue path as per ODM standard. >> Glue machine cleaning and debugging process has improved . >> Now after all improvement glue outflow issue has reduced as compared before- Ng rate reduced 4%" | 04/2025 | |||
| 3 | LCIK - 41667 |
Process Improvement |
Pawan Kumar Yadav , 51010085 |
Vinod sapehia , 51008613 |
Before PC kept at Desktop on Post AOI machine of all smt lines | After,Now PC at post AOI of all SMT lines hanged on rod by modifying clamps and table is free in space for kept on pallets. | 10/2024 | ||