Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 43151 |
vacuum tooling classification. |
Akhilesh yadav , 51008584 |
Tushar Kumar , 51010722 |
Previously all the models vacuum tooling e.g FP & SP are kept in same location so it is very difficult to find out line running model on less time. | Now we separate FP & SP both the vacuum tooling rack so it is easy to find out the correct one in less time | 09/2025 | ||
| 2 | LCIK - 44062 |
uva star 2 Rf jig use in Yuva star 3 |
Vishnu Maurya , 51010585 |
Suresh chand , 51008894 |
before situation we ordered new jig as per model wise. | after situation we check the similar model if any model found then try to use in new model after quality verification. | 06/2026 | ||
| 3 | LCIK - 36939 |
Using phase check online |
rajan kumar pandey , 51009749 |
chandra shekhar , 51009333 khairul alam , 51008843 |
Before we are using phacecheck offline. In case of operator negelegency pcba can skip from this stage. | Now we are following zero tolerance policy at stage phasecheck so we are using schedular with phasecheck. using this stage online now there are no chance for skip sn mismatch. | 09/2022 | ||
| Previous 87 88 89 90 91 Next | |||||||||