Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 40114 |
process improvement |
ANKIT KUMAR , 166875 |
04/2024 | |||||
| 2 | LCIK - 40370 |
Process improvement |
Sumit Kumar Maurya , 59428 |
AKBAR ALI , 166227 |
1:- These all handest were failed in FT for Display white/flickering/dot issue. 2:- After CFT analysis found these are from incoming side issue , but IQC team has denied to accept them in vendor bucket. 3:- LCD pad damage defects has entred in process bucket, but still defect generation was not conclsued after multple trail. Last 3 motnhs LCD Rejection Data- A5_23 - 1.37% A7 Torch - 1.03% > This issue comes from incoming side also not visual by nacked eye. > High rejection observed from incoming but due to denied by IQC team each defect punched in process. | "1. Now after production meeting discussion, only sorting material will provide on line. 2. IQC Team will do 100% LCD soring , after LCD on and check fleckering and white issue. 3. After sorting , main line LCD rejection will check. " | 05/2024 | ||
| 3 | LCIK - 40882 |
Process improvement |
RAVI SHARMA , 51009539 |
RAVI KUMAR , 51009706 |
Earlier we have found model A7 torch pad have less solder due to this torch key failure in Assembly. | Now we have modified the stencil by step up design to 0.47 mils by which we have reduced the both failure.,before-0.02%,after-0.01% | 06/2024 | ||