** ***** Give Kaizen on Theme - Near Miss & win exciting prizes ! *****

Kaizen Corner

Sr. No Kaizen No Kaizen Theme Initiator Team Before
Situation
After
Situation
Month
1 LCIK - 37542
Process improvement
Manoj kumar , 44354
Subhash chandra yadav , 51008656
Rishee kumar , 373344
Dust particles issue due to printer bottom & top side low volume and bridging issue many defect generated due to this production hamper. Ioniser installation before printer top & bottom side due to dust particles issue resolve and many defect minimize low volume & bridging issue etc. 12/2022
2 LCIK - 42662
process improvement
Sumit Kumar Maurya , 59428
"1. Handset PCBA Antenna Pin damage found at SFT stage of Assembly Line. 2. After Analysis found Receiver Antenna was damage, which found in 1st Clean room(PCBA Installation Satge). 3. Before PCBA Installation we mapped all stages Process in which 2 stages suspected found. > Small RF cable Locking stage,where after locking Operator Finger hitting or coming near by this antenna. > 2nd Stage was Copper foil Pasting where Operator handling was not ok,At this stage Operator when working in less CT as defined then before fixing in guide pillar PCBA Operator closing the Flap during this Misshandling PCBA antenna pin getting Damage. 4.Operator Neglegency during work on PCBA." "1. Re-mapped the process of RF locking stage Operator that during bucking will take care finger will not come at this antenna.Also will ensure RF cable should be buckle in 1st time with proper alignment. 2 . All Stages Handling Process Checked,which all working on PCBA & Defect shown to all Operators. 3. Aware to Copper foil Pasting stage Operator that he will work after taking his Complete Cycle time,Flap will close after Fix PCBA in Guide pillar. 4. Also File the jig guide pillar daily shift starting for PCBA easily Fixing." 06/2025
3 LCIK - 42919
Process Improvement
Laurance Kumar , 51009470
Kendra Pal , 51010636
In keypad model before improvement, we are facing everyday line accumulation on-line and every day line stop for dial coding accumulation and everyday production loss as per production report. 08/2025
 Previous  874  875  876  877  878 Next