** ***** Give Kaizen on Theme - Near Miss & win exciting prizes ! *****

Kaizen Corner

Sr. No Kaizen No Kaizen Theme Initiator Team Before
Situation
After
Situation
Month
1 LCIK - 38308
Process Improvement
Anirudh Sharma , 51009364
Laurance Kumar , 51009470
After LCD test device put in tray and due to back side of torch there is chances of bypass torch fail handset from TORCH Test stage. There is change in process to put handset in reverse direction in tray so that TORCH Test stage manpower clearly seen torch is ON or OFF so that Failure handset is easily detect by manpower at TORCH & Head test stage. 03/2023
2 LCIK - 38053
Process Improvement
Pawan Kumar , 51008876
Operator apply glue and fix bracket in neckband leads to no capturing of skipage from glue stage Now process of gluing given at single stage and next stages doing snapping and check point given before snapping at snapping stage 02/2023
3 LCIK - 42661
Process improvement
Sumit Kumar Maurya , 59428
"Problem 1 >> Pressing machine callibrated with respect to dummy handset Problem 2 >> Antenna check point given in Sub-PCBA FPC cable buckling stage. Problem 3 >> 1. Found antenna pin damage at input which was generated from SMT. 2. Deployed a visual manpower at input to check for the antenna pin damage/bend issue.Found " "Problem 1 >> Validation method changed & Impression will be taken on physical dummy handset & image will be kept with time for record purpose. Problem 2 >> 1. Added a precaution point with picture in the RF cable routing stage. 2. Middle Cover keep in separate Block of tray. Problem 3 >> 1. SMT Team is checking for issues in SMT about the RC of antenna pin bend/damaged." 06/2025
 Previous  873  874  875  876  877 Next