Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 43769 |
VC Runtime Installation Failure – Permanent Resolution |
khairul alam , 51008843 |
mohammad salman , 51010612 Sumant Kumar Yadav , 51009654 |
Observed Issues: VC runtime installation failure Error during MSI file selection Tool verification pending PCBA software download failed Production Impact: Line delay risk Increased downtime Repeated manual troubleshooting Evidence Attached: Screenshot of installation error Screenshot of failed verification Screenshot of corrupted Package Cache folder | Improved Status: VC runtime installed successfully Tool verification completed Software download stage passed No repeated error observed System Status: Clean Package Cache folder Correct MSI file selected Stable installation process Evidence Attached: Screenshot showing “Successfully Uninstalled” Screenshot showing successful installation Screenshot of tool verification PASS Screenshot of software download OK | 02/2026 | ||
| 2 | LCIK - 38063 |
VBom Maker |
DURGESH KUMAR GUPTA , 51010090 |
, 51009882 Anuj Kumar Yadav , 51008899 |
previously this is work for update single vendor file single instrument . | now this is updated for multiple vendor data record and process on it. | 02/2023 | ||
| 3 | LCIK - 37980 |
Value fluctuation in band 40 and 41. |
Udaybhan Mishra , 51009650 |
SANJAY RUPANI , 51009511 |
we are facing high failure in Yuva 2 pro model at RF in band 40 and 41 due to this production was getting hampered continuously. | now we have changed sequence of band 40 and 41 so that at starting time of lte firstly it will start from band 40 then band 1 ,3,8 41 due to this value fluctuation rate reduced at some extent label. | 02/2023 | ||
| Previous 85 86 87 88 89 Next | |||||||||