| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 43639 |
Process improvement |
Ajaya Sahoo , 51009237 |
Lalit Mohan Joshi , 51009697 Subham chakrabortty , 43583 |
During router panel cutting, the PCB was kept in a tray, but there was no fixed place to keep the tray. Therefore, the operator placed the tray at different locations, causing the PCB to sometimes fall on the floor. | “Now, we have made a trolley and provided a fixed location, so the operator can easily place the tray and the PCB does not fall. | 01/2026 | ||
| 2 | LCIK - 38270 |
Process improvement |
, 51009593 |
Camera deco vinyl removal at ABC label leading to skippage as there is no Mention check point at further stages. | After modification (SOP ) vinyl removal point has been given to packing input stage operator and check point given at FVI stage to avoid skip page of vinyl and protect From lot rejection. | 05/2022 | |||
| 3 | LCIK - 41856 |
Process improvement |
Pawan Kumar , 51010648 |
Akash khantwal , 165232 |
Previously, we used to manually check each tool one by one with the help of FG code line item in SAP. This process was time-consuming and took more than one hour to find the report | We are collaborating with the SAP team to develop the ZPP_BOM T-code, which will provide a comprehensive report of BOM parts in a single run. This will greatly enhance our reporting capabilities | 11/2024 | ||