Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
1 | LCIK - 41036 |
![]() USE Material MRN process modification |
Rajneesh pathak , 51009999 |
ASIT KUMAR , 251834 RITIK KUMAR , 166523 |
MRN kit PCBA only Verified by Production & Repair team check all A Class Material than handover to MC. BUT we have checked only physical condition if we have checked physical with binding condition by help of testing any system S\W updated for cross validation. ( by scanning status show about PCBA Binding Status).Then we have control this type problem of running line. | We have control the problem of running line. | 07/2024 | ||
2 | LCIK - 40297 |
![]() use loop back chamber on 3rd floor |
BIKRAM MAHATO , 230287 |
3rd floor par abhi loopback test chamber laga hua nhi hai jiske wajha se line pr speaker crack by pass hone ki sambhawana hai | 1st Floor par loopback test karne ke liye loopback chamber use hota hai agar loopback test chamber 3rd Floor par bhi lag jata hai tab line se aane wali voice se oprater ko koi preshani nhi hogi or wo Speaker creak Voice Aur Speaker Low jaise Failure ko aashani se cheack kar payega. | 05/2024 | |||
3 | LCIK - 40702 |
![]() use loop back chamber on 3rd floor |
Sanjay Pandey , 51010365 |
RAM JASH Bind , 30076 |
Loopback test chamber is not yet installed on the third floor due to which there is a possibility of line speaker crack bypass | Loopback chamber is used to do loopback tests on 1st floor. If loopback test chamber is also installed on 3rd floor then the operator will not have any problem with the sound coming from the tab line or it will easily cause failure like Speaker's creak voice and Speaker's low. You will be able to check. | 06/2024 | ||
Previous 82 83 84 85 86 Next |