Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 37335 |
Process improvement .. |
Ramkesh Singh , 53289 |
Teetoo kumar , 51008357 PANKAJ KUMAR , 51009177 |
If water label is pasting on shield or below copper foil sticker then there is no means of water label so now water label will be paste near main camera border line of PCBA. | Now Main PCBA water label is pasting on shield then paste copper foil on that shield and also covering water label below copper foil. | 11/2022 | ||
| 2 | LCIK - 37302 |
Process improvement . |
Ramkesh Singh , 53289 |
Teetoo kumar , 51008357 |
SOP modified with defined process in model Lava Blaze pro for major issue of Power key/Finger sensor key press hard.. | SOP modified with defined process to prevent unnecessary rejection (Added or defined process:- FPC half twist in clockwise direction) | 11/2022 | ||
| 3 | LCIK - 38404 |
Process improvement & safety |
Anoop kumar tiwari , 51009703 |
AJAY SHARMA , 44715 |
Before-: At the nearby of laser marking machine smell was coming during laser marking | Now we have disconnected the fan connection and packed with tape located in the back side of the machine. now there was no smell coming in that area. | 03/2023 | ||
| Previous 817 818 819 820 821 Next | |||||||||