Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 40046 |
Process Improvement In Model TWS T31 at Audio Testing stage |
Ravi Prakash Yadav , 51010012 |
Vinay Shekhar , 59429 Prakash , 51009675 |
Earlier In Model Probuds T31, For Audio Testing, Earbuds were turned on by manual press in. Due to which taking more time to getting on. | Now, Charging Case Provided to the Operator For Turned On to Earbuds. due to Which saving the time and Earbuds easily getting turned on. | 04/2024 | ||
| 2 | LCIK - 41388 |
Process Improvement In Model ProWatch S3 |
Ravi Prakash Yadav , 51010012 |
Ashish Kumar Patel , 51009176 |
Earliar, ProWatch S3 Running in 3 Part SFG1, SFG2, Main SFG due to this Facing issue During Devices Tracking. | Now, Perocess Improvement and Running single flow in Main SFG. So, We Can easily Tracking. | 09/2024 | ||
| 3 | LCIK - 37963 |
Process Improvement in Material traceability |
Neeraj Mani Tripathi , 51009712 |
Before this segregate and arrangement , two or three model TPU cover mixed in every bin so it is difficult to find all over phy stock when concern model is running | Now we segregate all model TPU cover and back cover and display model name ,quantity out side of Bin . The resultant is if we need a specific model TPU or back cover then we find it easily. | 02/2023 | |||
| Previous 813 814 815 816 817 Next | |||||||||