Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 41428 |
Process improvement. |
Shubham chand boudai , 51010132 |
Yashbir , 51008101 Vikas kumar prajapati , 51009930 |
in previous we use scale method for detection . but some time no color change difference between body and surface this is fail. | NOW we use image match method for detection , give pin count of BTB connector and its image with x and y box separation . it is very useful for btb connector shifting and upsidedown detection . | 09/2024 | ||
| 2 | LCIK - 41685 |
Process improvement. |
Rohit kumar ray , 51009727 |
Aditaya Singh , 45205 |
10/2024 | ||||
| 3 | LCIK - 39129 |
Process improvement. |
Yashbir , 51008101 |
Brajesh , 51009217 Sanket , 51009008 |
Before we have to use direct lighting in mic.so Drop page and shifting issue found in sub board. | After that we change direct lighting to shadow lighting in mic.now drop page and shifting issue control. | 11/2023 | ||
| Previous 805 806 807 808 809 Next | |||||||||