Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 41601 |
Process improvement. |
Anurag Shukla , 51009676 |
Piyush Malhotra , 51010258 Prabhat kumar kushwaha , 51009705 |
At line 1 top side printer board not inter automatically. Because link conveyor PLC program not ok as conveyor requirement. which this problem come. | Now we change PLC program of link conveyor due to this board inter automatically. And machine running ok. | 10/2024 | ||
| 2 | LCIK - 37765 |
Process improvement. |
Prabhat kumar kushwaha , 51009705 |
Before-: in the new laser marking machine we are facing mark error issue because sometime the pallet was not coming at the right position on the sensor. | After-: now we have blocked the hole of the pallet by tape.Now pallet coming at the right position on the sensor. Pic attached for reference. After-: now we have blocked the hole of the pallet by tape.Now pallet coming at the right position on the sensor. | 01/2023 | |||
| 3 | LCIK - 39305 |
Process improvement. |
, 51009929 |
Sanket , 51009008 Akhilesh yadav , 51008584 |
Model O-1 swim we are facing connector shorting issue because PCB have not support at palate,during print excess and bridge issue at connector location. | 10/2023 | |||
| Previous 796 797 798 799 800 Next | |||||||||