** ***** Give Kaizen on Theme - Near Miss & win exciting prizes ! *****

Kaizen Corner

Sr. No Kaizen No Kaizen Theme Initiator Team Before
Situation
After
Situation
Month
1 LCIK - 41275
Process improvement.
Sanket , 51009008
Shubham , 51009029
Yashbir , 51008101
All EOL model stencil and tolling was placed on shop floor and mixed up with running model so there was chances to load wrong tolling or stencil on line because of we have similar model name . We make a list of EOL model and seperate all stencil and tolling and move to ground floor smt store. 08/2024
2 LCIK - 41276
Process improvement.
Yashbir , 51008101
Brajesh , 51009217
Sanket , 51009008
featured in mounter direct lighting deployed for recognition so there was droppage and failure of MIC up-side down at pre AOI. Now we have deployed shadow lighting feature for recognition and brightness check feature also deployed for Up-side down and validated the failure control. 08/2024
3 LCIK - 41288
Process improvement.
Shubham chand boudai , 51010132
Yashbir , 51008101
, 51009929
BTB connector attached with pcb and this pcb mount on main pcb . no body mark or special mark on body for polarity detection. only a side cut on one corner on the pcb . At aoi we use 3d height detection on this corner cut of connector for polarity detection . 08/2024
 Previous  793  794  795  796  797 Next