Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 36804 |
Process Modification for Defect control |
Adarsh giri , 51009642 |
Before battery cover installation>>battery cover pressing >>Paste Camera lens>>Camera lens Pressing this stages are sequence wise in this sequence observe that is the dust particles in back cameras. | Now we changes the process is battery cover installation >>Paste Camera lens>>Camera lens Pressing>>battery cover pressing this stages are sequence wise so installation of battery cover stage are easily managed in cleaning room and after that camera lens assy done. | 08/2022 | |||
| 2 | LCIK - 39005 |
Process Modification |
Sujeet kumar mishra , 51009224 |
Process 1: Glass back cover appearance inspection and 2d Barcode pasting (1 MP) Process 2: Paste Flash Shield and Battery cover support Foam (2 MP) Process Hampered. | Process1: Unpack Glass back cover appearance inspection (1 MP) Process 2: Foam Pasting (2 MP) Process Smooth. Process 3: Paste Flash Shield and 2d Barcode pasting (1MP) | 10/2023 | |||
| 3 | LCIK - 37219 |
Process modification |
Laurance Kumar , 51009470 |
Anirudh Sharma , 51009364 |
11/2022 | ||||
| Previous 787 788 789 790 791 Next | |||||||||