** ***** Give Kaizen on Theme - Near Miss & win exciting prizes ! *****

Kaizen Corner

Sr. No Kaizen No Kaizen Theme Initiator Team Before
Situation
After
Situation
Month
1 LCIK - 36803
Process modification for productivity
Adarsh giri , 51009642
Before process are first current test >>battery fix>>battery pressing>>B2B Pressing >>speaker bracket fix. in this process at current stage continuously failures are coming due to sub pcba not proper fixed. Now process are first speaker bracket fix>> current test >>battery fix>>battery pressing>>B2B Pressing >>in this process at current stges zero failure coming of SUB PCBA loose because sub PCBA fixed with speaker bracket. 08/2022
2 LCIK - 37602
Process modification for dust reduction in Nokia shadowcat
Pawan Kumar , 51009498
Gange Naresh , 51009421
Abhin Manra , 51009366
In before situation, We are fixing Camera sleeve in display assembly and then buckling front camera , due to this easily dust entered in front camera cavity. In after situation, Now we are fixing camera sleeve first in front camera and after air ionizer fixed the front camera. 12/2022
3 LCIK - 36631
Process Modification for Defect control
, 51008095
Before battery cover installation>>battery cover pressing >>Paste Camera lens>>Camera lens Pressing this stages are sequence wise in this sequence observe that is the dust particles in back cameras. Now we changes the process is battery cover installation >>Paste Camera lens>>Camera lens Pressing>>battery cover pressing this stages are sequence wise so installation of battery cover stage are easily managed in cleaning room and after that camera lens assy done. 08/2022
 Previous  786  787  788  789  790 Next