Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 36958 |
Process modification in Lava Blaze Pro |
Pawan Kumar , 51009498 |
Gange Naresh , 51009421 Abhin Manra , 51009366 |
In before situation , 2D barcode pasting process was at TP input stage. | In after situation , now 2D pasting process added at input stage of PCBA . | 09/2022 | ||
| 2 | LCIK - 36938 |
Process modification in Blaze Pro for camera dust issue elimination |
Abhin Manra , 51009366 |
Pawan Kumar , 51009498 , 51009434 |
Few processes related to camera were performed outside the clean room and suspected as dust occurrence source. | After process modification stages related to the camera assembly performed inside the clean room. | 09/2022 | ||
| 3 | LCIK - 36456 |
Process modification for productivity |
, 51008878 |
Before process are first current test >>battery fix>>battery pressing>>B2B Pressing >>speaker bracket fix. in this process at current stage continuously failures are coming due to sub pcba not proper fixed. | Now process are first speaker bracket fix>> current test >>battery fix>>battery pressing>>B2B Pressing >>in this process at current stages zero failure coming of SUB PCBA loose because sub PCBA fixed with speaker bracket. | 07/2022 | |||
| Previous 785 786 787 788 789 Next | |||||||||