Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 43147 |
Process optimization |
Jamvant Yadav , 51010297 |
SOURAV , 51010388 |
lava A5__2025 Model: 1MP working at caption tape paste on Middle cover LCD pad corner and 1 MP working for Caption tape removing then paste LCD Insulation on LCD pad. | Caption tape removing process added with paste LCD Insulation on LCD pad then Caption tape removing manpower eliminate | 09/2025 | ||
| 2 | LCIK - 36868 |
Process modified for Defect control in Model Nokia |
, 51009067 |
Before battery cover installation>>battery cover pressing >>Paste Camera lens>>Camera lens Pressing this stages are sequence wise in this sequence observe that is the dust particles in back cameras. | Now we changes the process is battery cover installation >>Paste Camera lens>>Camera lens Pressing>>battery cover pressing this stages are sequence wise so installation of battery cover stage are easily managed in cleaning room and after that camera lens asy done. | 09/2022 | |||
| 3 | LCIK - 36977 |
Process modified for Defect control in Model Nokia |
Anirudh Sharma , 51009364 |
LALAN KUMAR , 51009578 |
Before battery cover installation>>battery cover pressing >>Paste Camera lens>>Camera lens Pressing this stages are sequence wise in this sequence observe that is the dust particles in back cameras. | Now we changes the process is battery cover installation >>Paste Camera lens>>Camera lens Pressing>>battery cover pressing this stages are sequence wise so installation of battery cover stage are easily managed in cleaning room and after that camera lens asy done. | 09/2022 | ||
| Previous 784 785 786 787 788 Next | |||||||||