Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 39596 |
Process rejection |
Saurav semwal , 51010353 |
Saurav semwal , 51010353 Saurav semwal , 51010353 |
In model YUVA 3 - Front camera dust was not visible after inserting Front TPU. | We have modified TPU by small cutting of that camera area, now it is feasible to check dust with TPU. as we have used old model TPU for this model and save cost by not ordering new TPIU | 01/2024 | ||
| 2 | LCIK - 37929 |
Process Quality Improvement |
, 51008095 |
Abhishek kumar , 165304 |
Before process maximum time we face main lens uplift issue on lines during FT | Now we have given check point at auto screwing stage operator for check the main lens uplift and change his drop test process after that main lens uplift issue is not coming during FT | 02/2023 | ||
| 3 | LCIK - 37755 |
Process Quality Improvement |
, 51009944 |
At present feature phones are run on line directly without any tray till IMEI write stage, and then these handsets are run on tray after IMEI write stage. | If we run all feature phones in tray after IMEI label paste stage then we can improve handling of device on line also scratch issue on main lens due to process on line can be reduced to a great extent. | 01/2023 | |||
| Previous 782 783 784 785 786 Next | |||||||||