Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 42999 |
productivity |
Sachin yadav , 51009625 |
At present in sop it is given to first align from the finger print side and the align the left bottom side and then fix in anti chockers direction | operator will not slide the bracket with finger from left and right | 08/2025 | |||
| 2 | LCIK - 40191 |
Productivity |
Pradeep Gupta , 51010403 |
Mixing of TPU cover for increasing the capacity but causing defects like dent, peel off of paint, improper fitment. | Less modification in jigs platforms, non mixing of TPU covers online. Increase in UPH. | 04/2024 | |||
| 3 | LCIK - 37640 |
production Report tracking |
Suresh chand , 51008894 |
, 59748 |
Before No tracking of FVI vs PKG in system and manual | Now Separate manually Tracking started in every shift to avoid the Gap and same report Share in production meeting everyday | 01/2023 | ||
| Previous 772 773 774 775 776 Next | |||||||||