Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 43234 |
Productivity |
Krishna Kumar Singh , 51010395 |
Earlier we opened the system with the help of key board due to which sometimes it took extra time to open the system due to which it took extra time to open the system during changeover or there was loss of production or due to which we had downtime. | Now we use a 2D barcode which is scanned by the scanner with the help of which the time taken to open the system is reduced or the system is opened without the keyboard or there is no loss of production. | 10/2025 | |||
| 2 | LCIK - 40425 |
Productivity |
Priyamjit Paul , 51009135 |
There is a high chance in the packing stage cleaning and wallpaper paste stage where device can fall off in dustbin as the back wallpaper poly falls in open dustbin. | 05/2024 | ||||
| 3 | LCIK - 40682 |
Productivity |
ANKIT KUMAR , 166875 |
In this Model PCBA & Sub PCBA lock diameter was less as compare to RF cable diameter that's why its getting SCRAP & Failure rate Increasing & Productivity also getting Hamper. | After this We taken Temporary Counter Action to avoid Scrap rate, failure & Productivity at assembly line. we added the Manual Process to open PCBA & sub PCBA lock after this All things got improved at Assembly line. | 06/2024 | |||