Kaizen Corner

Sr. No Kaizen No Kaizen Theme Initiator Team Before
Situation
After
Situation
Month
1 LCIK - 43234
Productivity
Krishna Kumar Singh , 51010395
Earlier we opened the system with the help of key board due to which sometimes it took extra time to open the system due to which it took extra time to open the system during changeover or there was loss of production or due to which we had downtime. Now we use a 2D barcode which is scanned by the scanner with the help of which the time taken to open the system is reduced or the system is opened without the keyboard or there is no loss of production. 10/2025
2 LCIK - 40425
Productivity
Priyamjit Paul , 51009135
There is a high chance in the packing stage cleaning and wallpaper paste stage where device can fall off in dustbin as the back wallpaper poly falls in open dustbin. 05/2024
3 LCIK - 40682
Productivity
ANKIT KUMAR , 166875
In this Model PCBA & Sub PCBA lock diameter was less as compare to RF cable diameter that's why its getting SCRAP & Failure rate Increasing & Productivity also getting Hamper. After this We taken Temporary Counter Action to avoid Scrap rate, failure & Productivity at assembly line. we added the Manual Process to open PCBA & sub PCBA lock after this All things got improved at Assembly line. 06/2024