Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 38108 |
Productivity |
YOGESH KUMAR , 44540 |
SANJIV KUMAR MISHRA , 82037 Anuj Kumar , 81404 |
Dear Sir On the RF Stage fail PCBA Running long time in the jig .A fresh PCBA Pass in the 30 Second but fail PCBA Running continua after 85- 104 Second Fail in the system .in case Pass PCBA time =30 & Fail PCBA time 90 second That is loss of the production | when GSM Fail PCBA Sow in the system under 20 second but done fail 85-104 second. we all want PCBA fail in 20 - 25 second . please implement this issue . I HOPE TO YOU YOU ARE UNDERSTAND . TAKE SOMTHING ACTION THANKS SIR | 02/2023 | ||
| 2 | LCIK - 37087 |
Productivity |
Subhash chandra , 51009482 |
, 64799 |
Door was not available in Empty room due to much cooling loss was there. | 10/2022 | |||
| 3 | LCIK - 38370 |
Productivity |
, 51009068 |
SHIBARAM MAHANTI , 81651 |
Operator was removing 2D bar of left & Right speaker wire of neck band by finger nail. In this condition operator CT was Increasing and also operator suffering by finger pain. Line was sticking every hour at this stage and out put hampering very badly of neck band. | After Provided of SCISSOR 2D cutting made easy. No line stoppage and no finger pain issue at this stage and line running very smoothly. After that we achieved 1800 qty target ok neckband N31. | 03/2023 | ||
| Previous 768 769 770 771 772 Next | |||||||||