** ***** Give Kaizen on Theme - Near Miss & win exciting prizes ! *****

Kaizen Corner

Sr. No Kaizen No Kaizen Theme Initiator Team Before
Situation
After
Situation
Month
1 LCIK - 40297
use loop back chamber on 3rd floor
BIKRAM MAHATO , 230287
3rd floor par abhi loopback test chamber laga hua nhi hai jiske wajha se line pr speaker crack by pass hone ki sambhawana hai 1st Floor par loopback test karne ke liye loopback chamber use hota hai agar loopback test chamber 3rd Floor par bhi lag jata hai tab line se aane wali voice se oprater ko koi preshani nhi hogi or wo Speaker creak Voice Aur Speaker Low jaise Failure ko aashani se cheack kar payega. 05/2024
2 LCIK - 40702
use loop back chamber on 3rd floor
Sanjay Pandey , 51010365
RAM JASH Bind , 30076
Loopback test chamber is not yet installed on the third floor due to which there is a possibility of line speaker crack bypass Loopback chamber is used to do loopback tests on 1st floor. If loopback test chamber is also installed on 3rd floor then the operator will not have any problem with the sound coming from the tab line or it will easily cause failure like Speaker's creak voice and Speaker's low. You will be able to check. 06/2024
3 LCIK - 39171
Use ESD brass to clean the dust.
Pawan Kumar Yadav , 51010085
Vinod sapehia , 51008613
Earlier We are using AIR ionizer to clean the router cutting dust due to this we are facing MIC foam damage issue .. Now we using ESD brass only to clean the router cutting dust ..after this control foam damage issue. 08/2023
 Previous  75  76  77  78  79 Next