Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 40137 |
Productivity |
Naveen Kumar , 51010495 |
After PCR given by QA team we rearranged process as per given below 1. Battery binding & Battery connector fixing & fix battery & press battery 2. Battery binding & Battery connector fixing & fix battery & press battery There was 2 duplicate sop for this so we added one more scanning setup. | Now we modified battery fixing process & now process is as per given below 1. Battery unpacking & connector fixing & battery fixing 2. Battery scanning & binding & Battery pressing So we saved one scanning setup from all smart phone. | 04/2024 | |||
| 2 | LCIK - 40907 |
Productivity |
Pankaj Tiwari , 51010434 |
Abhishek Kumar , 45054 |
Earlier, the Wish Power charger used to come with poly and rubber on the line, due to which there was no problem while binding the charger to the line. | Wish Power charger is being used without rubber on the line which while tying the charger on the line, the charger is getting opened due to which the line is getting Hamper again and again | 07/2024 | ||
| 3 | LCIK - 42453 |
Productivity |
Pankaj Tiwari , 51010434 |
Due to the removal of the stopper from the 3rd floor packing line 7 FVI and its weight, the handset is skipping and running on 2nd stage OQA 2, and the line has to be stopped again and again. | If we put a fixed stopper there FVI stage, there will be no problem, and the line will not have to be shut down again and again. Due to the line being shut down, handsets pile up on the packing line. | 05/2025 | |||
| Previous 767 768 769 770 771 Next | |||||||||