Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 37276 |
Productivity |
, 64799 |
Praveen kumar , 51009477 |
11/2022 | ||||
| 2 | LCIK - 41392 |
productivity |
Sachin yadav , 51009625 |
Partially QR code coming over audio jack converter (C-type) and not bind in system. | completely QR Code will come over Audio Jack converter and bind in system so that there would be no skip page from operator. | 09/2024 | |||
| 3 | LCIK - 43457 |
productivity |
Sachin yadav , 51009625 |
Anurag Pathak , 30154 |
Now Process is that Soldering the LED no precaution or check point that Solring should not be at outer edge PCBA groove pad. | After change the operator will do the soldering at designated solder pad area ng pic also attached in SOP | 12/2025 | ||
| Previous 765 766 767 768 769 Next | |||||||||