Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 38031 |
Productivity |
Roopendra Singh , 51009742 |
, 51009068 |
Operator using vacuum cap by hand then he feel pain his hand and unable to work with full efficiency. | Provided a handle to use vacuum cap operator feeling very well for his work and doing work with full efficiency and production not hampering at that stage. | 02/2023 | ||
| 2 | LCIK - 41616 |
Productivity |
, 51010393 |
RAMAKRISHNA PRADHAN , 30166 |
When we changeover from feature phone to smartphone, we have to do IMEI label printer movement, it is a waste of time | We talked to PE, PQC or Production to get the IMEI label stage fixed as same feature phone. Due to this we will not be delayed in the change over time will not be wasted | 10/2024 | ||
| 3 | LCIK - 41618 |
Productivity |
Sachin yadav , 51009625 |
RAMAKRISHNA PRADHAN , 30166 |
he stage of Sub PCBA input was before main PCBA. Sub PCBA travelled multiple stages, increasing chances of more Miss handling | The Sub PCBA input stage shifted just 3 stages before fitment of Sub PCBA in TP | 10/2024 | ||
| Previous 763 764 765 766 767 Next | |||||||||