Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 37257 |
Productivity |
, 51009944 |
In Nokia model, at current test stage we had 5 port which is neck to neck of target, we have no back system against for failure system which cause of production loss nearly 20 pcs hourly.(150 pcs per shift). | Now increasing the one port at current test stage, we have increases the production of 200 pcs.( per shift). | 11/2022 | |||
| 2 | LCIK - 38030 |
Productivity |
, 51009068 |
, 51009593 |
Operator appling glue at battery upper case fitment stage by glue bottle and in this case operator pressing the bottle by manually and he feel pain in his finger and gluing unwanted place or less or excess glue on upper case cover. Result line hamper at glue cleaning stage. | After providing the Machenical glue gun. Operator applying the glue with without any fatigue in finger and doing proper gluing as per given point. | 02/2023 | ||
| 3 | LCIK - 41614 |
Productivity |
Jabbar ali , 51010565 |
RAMAKRISHNA PRADHAN , 30166 |
earlier no any use of z53 model rf jigs due to this model not in use. beacuse this model had OEL | now we are modify all rf jigs of z53 model to hero power model due to this we saved lot of time and cost also | 10/2024 | ||