Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
1 | LCIK - 37360 |
Use of Barcodes at Keypart & Accessaries binding stages. |
Janaki Ballav Pattanaik , 51009457 |
Vinod sapehia , 51008613 |
11/2022 | ||||
2 | LCIK - 40480 |
USE Material MRN process modification |
Vipin kumar singh , 51008102 |
MRN kit PCBA only Verified by Production & Repair team check all A Class Material than handover to MC. BUT we have checked only physical condition if we have checked physical with binding condition by help of testing any system S\W updated for cross validation. ( by scanning status show about PCBA Binding Status).Then we have control this type problem of running line. | We have control the problem of running line. | 05/2024 | |||
3 | LCIK - 41036 |
USE Material MRN process modification |
Rajneesh pathak , 51009999 |
ASIT KUMAR , 251834 RITIK KUMAR , 166523 |
MRN kit PCBA only Verified by Production & Repair team check all A Class Material than handover to MC. BUT we have checked only physical condition if we have checked physical with binding condition by help of testing any system S\W updated for cross validation. ( by scanning status show about PCBA Binding Status).Then we have control this type problem of running line. | We have control the problem of running line. | 07/2024 | ||
Previous 74 75 76 77 78 Next |