** ***** Give Kaizen on Theme - Near Miss & win exciting prizes ! *****

Kaizen Corner

Sr. No Kaizen No Kaizen Theme Initiator Team Before
Situation
After
Situation
Month
1 LCIK - 37360
Use of Barcodes at Keypart & Accessaries binding stages.
Janaki Ballav Pattanaik , 51009457
Vinod sapehia , 51008613
11/2022
2 LCIK - 40480
USE Material MRN process modification
Vipin kumar singh , 51008102
MRN kit PCBA only Verified by Production & Repair team check all A Class Material than handover to MC. BUT we have checked only physical condition if we have checked physical with binding condition by help of testing any system S\W updated for cross validation. ( by scanning status show about PCBA Binding Status).Then we have control this type problem of running line. We have control the problem of running line. 05/2024
3 LCIK - 41036
USE Material MRN process modification
Rajneesh pathak , 51009999
ASIT KUMAR , 251834
RITIK KUMAR , 166523
MRN kit PCBA only Verified by Production & Repair team check all A Class Material than handover to MC. BUT we have checked only physical condition if we have checked physical with binding condition by help of testing any system S\W updated for cross validation. ( by scanning status show about PCBA Binding Status).Then we have control this type problem of running line. We have control the problem of running line. 07/2024
 Previous  74  75  76  77  78 Next