Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 41536 |
productivity |
Jabbar ali , 51010565 |
RAMAKRISHNA PRADHAN , 30166 |
Previously, we used to manually check each tool one by one with the help of FG code line item in SAP. This process was time-consuming and took more than one hour to find the report | We are collaborating with the SAP team to develop the ZPP_BOM T-code, which will provide a comprehensive report of BOM parts in a single run. This will greatly enhance our reporting capabilities | 09/2024 | ||
| 2 | LCIK - 41537 |
productivity |
Jabbar ali , 51010565 |
RAMAKRISHNA PRADHAN , 30166 |
Before there was no option to find out part batch in SAP.from which our MRN work was delay due to batch not found in SAP | Now ZM2M_MASTER_REP New T-code created for consolidate part batch in SAP.from which our MRN Activity easily complete on time | 09/2024 | ||
| 3 | LCIK - 42566 |
productivity |
Pradeep Sharma , 51010040 |
Earlier we are doing only top side visual of Sub PCBA USB jack .Due to huge chances of skippage USB uplift issue. | Now we started both side(top & bottom) visual inspection of Sub PCBA USB jack in model Yuva 2 Pro .After that controlled USB jack uplift issue | 05/2025 | |||
| Previous 757 758 759 760 761 Next | |||||||||