Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 43832 |
Productivity |
Sumit Kumar Maurya , 59428 |
Earlier we opened the system with the help of key board due to which sometimes it took extra time to open the system due to which it took extra time to open the system during changeover or there was loss of production or due to which we had downtime. | Now we use a 2D barcode which is scanned by the scanner with the help of which the time taken to open the system is reduced or the system is opened without the keyboard or there is no loss of production. | 03/2026 | |||
| 2 | LCIK - 42043 |
productivity |
Sumit Kumar Maurya , 59428 |
We are facing high failure at RF in band 40 and 41 due to this production was getting hampered continuously. | Now we have changed sequence of band 40 and 41 so that at starting time of lt firstly it will start from band 40 then band 1 ,3,8 41 due to this value fluctuation rate reduced at some extent label. | 01/2025 | |||
| 3 | LCIK - 42044 |
productivity |
Akbar Ali , 51010494 |
Before we are using Opti plex 3080 at stage software only due to high cycle time at stage RF. | After changes in bios setting team is eligible to use this PC also at RF stage. This PC performs better than other PC. | 01/2025 | |||
| Previous 756 757 758 759 760 Next | |||||||||