Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 42551 |
productivity |
Sachin yadav , 51009625 |
05/2025 | |||||
| 2 | LCIK - 42040 |
productivity |
Sumit Kumar Maurya , 59428 |
Earlier we opened the system with the help of a keyboard which sometimes it took extra time to open the system due to which it took extra time to open the system during a changeover or there was a loss of production or due to which we had downtime. | Now we use a 2D bar code which is scanned by the scanner with the help of which the time taken to open the system is reduced or the system is opened without the keyboard or there is no loss of production. | 01/2025 | |||
| 3 | LCIK - 42552 |
productivity |
Sachin yadav , 51009625 |
Now no Vendor Rejection tracker was at Assy Production | Now we have make Vendor Rejection tracker started | 05/2025 | |||