** ***** Give Kaizen on Theme - Near Miss & win exciting prizes ! *****

Kaizen Corner

Sr. No Kaizen No Kaizen Theme Initiator Team Before
Situation
After
Situation
Month
1 LCIK - 43042
productivity
Krishna Kumar Singh , 51010395
Before We are using Z Tcode in SAP PCBA moved After Physical scanning by PQC and after receiving in SMT they will accept In SAP. and this process is taking time Now we have Changed the process in which PQc is sharing Detail on requisition Slip after Physical validation mc is sharing Document number after Posting . PCBA movement is allow only after Posting. 08/2025
2 LCIK - 42533
productivity
Krishna Kumar Singh , 51010395
Before all trays were mixed in a cartoon . Also no any identification on cartoon . Due to this when we needed a tray we started to search . For doing this we take more time as well as production became hamper for this . Now we segregate all different types of tray in different cartoon as well as to searching easily we pasted the tag according their identification . For doing this we easily now find the any tray . 05/2025
3 LCIK - 40230
productivity
, 51010499
Before-Previously we are facing solder ball and sim connector uplift issue due to pallet not open on sim card through-hole location. After-Now we modify the pallet in house on sim connector through-hole location so temp. properly reached at sim connector so uplift issue and solder ball issue resolved. last One month continue observed but we can not face such issue repeatedly. 04/2024
 Previous  753  754  755  756  757 Next