Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 43042 |
productivity |
Krishna Kumar Singh , 51010395 |
Before We are using Z Tcode in SAP PCBA moved After Physical scanning by PQC and after receiving in SMT they will accept In SAP. and this process is taking time | Now we have Changed the process in which PQc is sharing Detail on requisition Slip after Physical validation mc is sharing Document number after Posting . PCBA movement is allow only after Posting. | 08/2025 | |||
| 2 | LCIK - 42533 |
productivity |
Krishna Kumar Singh , 51010395 |
Before all trays were mixed in a cartoon . Also no any identification on cartoon . Due to this when we needed a tray we started to search . For doing this we take more time as well as production became hamper for this . | Now we segregate all different types of tray in different cartoon as well as to searching easily we pasted the tag according their identification . For doing this we easily now find the any tray . | 05/2025 | |||
| 3 | LCIK - 40230 |
productivity |
, 51010499 |
Before-Previously we are facing solder ball and sim connector uplift issue due to pallet not open on sim card through-hole location. | After-Now we modify the pallet in house on sim connector through-hole location so temp. properly reached at sim connector so uplift issue and solder ball issue resolved. last One month continue observed but we can not face such issue repeatedly. | 04/2024 | |||
| Previous 753 754 755 756 757 Next | |||||||||