Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 43788 |
Productivity |
Abhinay Kumar , 51010537 |
Vikas kumar prajapati , 51009930 Yashbir , 51008101 |
Earlier, when stencil damage occurred, it was difficult to identify in which shift the damage happened and what was the exact reason. There was no proper record available. Because of this, the root cause could not be identified easily, and it also affected production and productivity. | After implementing the data sheet system, every stencil-related activity is now recorded. This helps in identifying the shift, operator, and reason for stencil damage. As a result, root cause analysis has become easier and control over stencil handling has improved, reducing the impact on production and productivity. It is a excel file. | 03/2026 | ||
| 2 | LCIK - 39952 |
Productivity |
Anoop Kumar , 51010463 |
When we changeover from feature phone to smartphone, we have to do IMEI label printer movement, it is a waste of time. | We talked to PE, PQC or Production to get the IMEI label stage fixed as same feature phone. Due to this we will not be delayed in the change over time will not be wasted | 03/2024 | |||
| 3 | LCIK - 43029 |
productivity |
Krishna Kumar Singh , 51010395 |
Earlier we opened the system with the help of a keyboard which sometimes it took extra time to open the system due to which it took extra time to open the system during a changeover or there was a loss of production or due to which we had downtime. | Now we use a 2D barcode which is scanned by the scanner with the help of which the time taken to open the system is reduced or the system is opened without the keyboard or there is no loss of production. | 08/2025 | |||