Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 43590 |
Productivity & Quality |
Pushpendra Pal , 51010202 |
Shubham chand boudai , 51010132 Vikas Rawat , 51010697 |
before using 235 csn nozzle in 16 head mounter | now using 240 N nozzle in 8 head mounter | 01/2026 | ||
| 2 | LCIK - 41967 |
PRODUCTIVITY IMPROVEMENT |
Akhilesh yadav , 51008584 |
Sanket , 51009008 |
In SPI machine ,Due to large panel size of model A3 TORCH M machine conveyor belt getting remove frequently so belt getting damage and line stop. so unwanted loss coming on line. | Now we change machine running mode from fast to standard and slow down loading and unloading speed after that board running smoothly and no any belt removal case found on line. so production running continuously. | 12/2024 | ||
| 3 | LCIK - 43521 |
Productivity |
Sumit Kumar Maurya , 59428 |
Model- Yuva Pro 2 Stage- Unpack Battery & Scan Battery Fix Battery Connector & Fix Battery Scanning also had to be done at the battery fixing stage due to which accumulation takes place | By getting the battery scanned at the battery pressing stage, both the stages will be balanced | 12/2025 | |||