** ***** Give Kaizen on Theme - Near Miss & win exciting prizes ! *****

Kaizen Corner

Sr. No Kaizen No Kaizen Theme Initiator Team Before
Situation
After
Situation
Month
1 LCIK - 43590
Productivity & Quality
Pushpendra Pal , 51010202
Shubham chand boudai , 51010132
Vikas Rawat , 51010697
before using 235 csn nozzle in 16 head mounter now using 240 N nozzle in 8 head mounter 01/2026
2 LCIK - 41967
PRODUCTIVITY IMPROVEMENT
Akhilesh yadav , 51008584
Sanket , 51009008
In SPI machine ,Due to large panel size of model A3 TORCH M machine conveyor belt getting remove frequently so belt getting damage and line stop. so unwanted loss coming on line. Now we change machine running mode from fast to standard and slow down loading and unloading speed after that board running smoothly and no any belt removal case found on line. so production running continuously. 12/2024
3 LCIK - 43521
Productivity
Sumit Kumar Maurya , 59428
Model- Yuva Pro 2 Stage- Unpack Battery & Scan Battery Fix Battery Connector & Fix Battery Scanning also had to be done at the battery fixing stage due to which accumulation takes place By getting the battery scanned at the battery pressing stage, both the stages will be balanced 12/2025
 Previous  748  749  750  751  752 Next