Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 41966 |
PRODUCTIVITY AND PROCESS IMPROVEMENT |
Akhilesh yadav , 51008584 |
Sanket , 51009008 |
Before Tolling dowel pin Hight not proper due to same panel not getting fix on tolling and during print hight error coming in printer, So unwanted loss coming on line . | We check tolling dowel pin hight and modify with file and check after modification panel getting fix properly on Tolling and model running smootly . | 01/2025 | ||
| 2 | LCIK - 43321 |
Productivity and process Improvement |
Akhilesh yadav , 51008584 |
Abhinay Kumar , 51010537 |
Before we put ok and ng squeegee mix running at line which problem is create ex- high volume, bridging , dent issue. | Now we make data sheet which running line squeegee and note down sr. number and checked all squeegee,separate ng and ok. | 10/2025 | ||
| 3 | LCIK - 43322 |
Productivity and process Improvement |
Akhilesh yadav , 51008584 |
Abhinay Kumar , 51010537 |
before Cleaner holder unit thread damage so it created PCB cleaning issue during general machine running at line 1 top side Printer. | Now we have fixed it by drilling in holder base and tighten by nut and bolt, Have observed the issue and now it's running normal at it's optimized with all interfaces. | 10/2025 | ||
| Previous 744 745 746 747 748 Next | |||||||||