Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 42183 |
productivity and quality improvement |
Pawan Kumar , 51010648 |
No any check sheet permanent procedure on shopfloor | Now we have implemented and work as per adhered with new implemented check sheet. | 02/2025 | |||
| 2 | LCIK - 41975 |
PRODUCTIVITY AND QUALITY IMPROVEMENT |
Akhilesh yadav , 51008584 |
Sanket , 51009008 |
Now we change defected batch code pcba and monitoring all upcoming batch code pcba so the issue is resolved and no failure found for bridging and low volume. | 01/2025 | |||
| 3 | LCIK - 40849 |
Productivity and quality |
Sourabh Rai , 51010507 |
Ajay Rawat , 51010479 |
Earlier the battery percentage limit was Lower : 45% Upper : 100% due to which defective battery intercepted at OQA 1 as defective battery shows 100% charge status which match the criteria so tester was unable to detect this defect. | 06/2024 | |||
| Previous 739 740 741 742 743 Next | |||||||||