Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 42489 |
Productivity Improvement |
Yashbir , 51008101 |
Prabhat kumar kushwaha , 51009705 Parupkar Singh Brar , 51010649 |
Before cycle time is 48.2sec, we have found Barcode and string both print in top side panel. | After remove String now cycle time is 38.4. and now cycle time meet as per production plan. | 05/2025 | ||
| 2 | LCIK - 38398 |
Productivity Improvement |
, 51009680 |
AJAY SHARMA , 44715 |
Before :- The moving motor cable of the laser machine got damaged and we had to install a new cable. | After :-The moving motor cable of the laser machine got damaged and we repaired that cable here. then machine running same time | 03/2023 | ||
| 3 | LCIK - 38399 |
Productivity Improvement |
Prabhat kumar kushwaha , 51009705 |
MO RASHID , 44556 RAJNEESH SEN , 45011 |
Blower fan motor was burned,but blower rotor fan ok | so we are replaced the rotor blower fan from other ng blower fan. | 03/2023 | ||
| Previous 735 736 737 738 739 Next | |||||||||