Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 39143 |
Productivity Improvement |
Rohit kumar ray , 51009727 |
Krishna Puri , 166868 |
In Chiller of all reflow oven we could not measure low level and high level of DI water due to that in case of low level reflow oven starts giving alarm and result reflow operation effected. | we define high and low level stciker for DI water so that we can check the measurement and can fill it before it reach low level. In this way we maintain the issue and it improve process and no loss effect to production. | 11/2023 | ||
| 2 | LCIK - 41703 |
Productivity Improvement |
Jaydeep Chaturvedi , 51009711 |
At RF sage mostly PC ports get blocked due to which PC was restarted or it get changed. This process of troubleshooting consume more time due to which it impact on production. | We have tried by installing the USB hub in OK ports it work as multiple ports and RF PV working fine after doing ports. due to which no loss will occurred. | 10/2024 | |||
| 3 | LCIK - 39403 |
Productivity Improvement |
Sanket , 51009008 |
Brajesh , 51009217 Shubham chand boudai , 51010132 |
Previously we are facing solder ball and sim connector uplift issue due to pallet not open on sim card through-hole location. | Now we modify the pallet on sim connector through-hole location so temp. properly reached at sim connector so uplift issue and solder ball issue resolved . One week continue observed but we cant face such issue repeatedly. | 12/2023 | ||