Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
1 | LCIK - 38586 |
USED ONLY A CLASS PART FROM TAPE BOARD AFTER THAT SCRAP THIS . |
DEEPAK TIWARI , 44340 |
AFTER TAPE BOARD FERIFICATION QUALITY TEAM HANDOVER TO PRODUCTION .PRODUCTION TEAM USED ONLY A CLASS PART FROM TAPE BOARD AFTER THAT SCRAP THIS . | BUT NOW AFTER A CLASS RECOVER PRODUCTION TEAM HANDOVER TO REPAIR FOR PCB REPAIR . BY THIS ACTIVITY WE CAN REPAIR MANY PCB WHICH FAIL FOR C CLASS | 04/2023 | |||
2 | LCIK - 40571 |
Used of Blaze2 5G model Back cover in YUVA 5G model. |
Ravi Prakash Yadav , 51010012 |
Vinay Shekhar , 59429 |
In YUVA 5G model 100% OQA inspection is going on due to which there is a shortage of back cover online . | Now we are using blaze 2 5G back cover in YUVA 5G during oqa inspection because blaze 2 5G and YUVA 5G back cover are similar. due to this no shortage of back cover will happened. | 05/2024 | ||
3 | LCIK - 39431 |
Used Needy Parts From Nokia Old Model Jig. |
Ravi Prakash Yadav , 51010012 |
Vinay Shekhar , 59429 |
We were facing shortage Of 2.5 MM screw for RF Fixture and need some serial cable connector for Weight Machine. We had old Current Jig of Nokia EOL Model. Which was not in use. | Now we have removed needy parts from them and using for Fixed the RF Fixture and repairing for RF cable. | 12/2023 | ||
Previous 71 72 73 74 75 Next |