Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 39395 |
Productivity Improvement |
, 51010344 |
RAJNEESH SEN , 45011 |
After Preventive Maintenance of Reflow Oven sometimes temperature variation occurs and it goes up and down in reflow oven zone,which shows variation in Zone temperature sometimes and temperature error in zones. | Now we start checking thermocouple point position in center of Blow out hole so that Temperature controller gets exact temperature getting by thermocouple pointer and teach manpower how to work over thermocouple area. Now no issue observed of temperature variation . | 12/2023 | ||
| 2 | LCIK - 39396 |
Productivity Improvement |
, 51010344 |
RAJNEESH SEN , 45011 |
Before,their is no marking on switches of repair conveyor light, operator by mistake close other switches of AOI machine due to this AOI machines get direct shutdown by mistake. | After, we mark identification separately so that particular switch needs to OFF. | 12/2023 | ||
| 3 | LCIK - 39652 |
Productivity Improvement |
Anoop kumar tiwari , 51009703 |
Krishna Puri , 166868 |
Before:-Huge Dust is coming on router stage after cutting in lava A1 model. | After:-We give suggestion to modify the design in new jig by block the connector area . doing this more vacuum suction and it decrease the dust level on PCB connector. | 02/2024 | ||