Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 39128 |
Productivity Improvement |
Shubham chand boudai , 51010132 |
Shubham , 51009029 Brajesh , 51009217 |
In Vitrox 3d Aoi when ng Array run in line.In previous single programme run in both lane at post aoi and 50% Skip method use.Thats why inspection cycle time increase and pruductivity decrease. | Now we use different programme for both lane and Use Skip board selection method for NG array inspection method . This decrease the inspection cycle time 2 to 3 second in every board and increase productivity . | 11/2023 | ||
| 2 | LCIK - 38361 |
Productivity Improvement |
Brajesh , 51009217 |
Shubham , 51009029 Yashbir , 51008101 |
Before we were facing high droppage issue in DFN diode due to part flip in cavity during pickup time hence PPM was very high. | After using vacuum feeder by recommendation of Panasonic team now droppage PPM reduction. | 03/2023 | ||
| 3 | LCIK - 40667 |
Productivity improvement |
, 51010432 |
Before no sequence for hiring. | now be conclude questionnaire format and sequencing also. | 06/2024 | |||
| Previous 724 725 726 727 728 Next | |||||||||