** ***** Give Kaizen on Theme - Near Miss & win exciting prizes ! *****

Kaizen Corner

Sr. No Kaizen No Kaizen Theme Initiator Team Before
Situation
After
Situation
Month
1 LCIK - 43453
Productivity Improvement
Vikas Rawat , 51010697
Akhilesh yadav , 51008584
Pushpendra Pal , 51010202
We had added method for outer shield detection only hence it was difficult to judge for inner shield shift. Now we have implemented the 3d height method for inner shield detection at Post AOI on base of PCB outing the shield, and validated the same and found feasible for inner shield shift detection 12/2025
2 LCIK - 39358
Productivity Improvement
Rajat Kumar , 51009439
RAJNEESH SEN , 45011
Before during Preventive maintenance of Reflow machine no checkpoint for checking heater resistance of all zones. Now we checked resistance of all top 7 bottom heater resistance in quarterly preventive Maintenance . this prevent any sudden breakdown due to week strength in resistivity. 12/2023
3 LCIK - 43454
Productivity Improvement
Vikas Rawat , 51010697
Pushpendra Pal , 51010202
Vikas kumar prajapati , 51009930
we are facing BGA IC Part shifting issue due to Vacuum leakage with normal nozzle due to part pick up surface is metallic. First time we are using this type of component in 5G. Now Part moved from mounter 7 to 6 and add Special Nozzle 185N with rubber tip to stable pickup position and also given detection at Pre AOI as well as validation the result found improved. 12/2025
 Previous  714  715  716  717  718 Next