Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 43453 |
Productivity Improvement |
Vikas Rawat , 51010697 |
Akhilesh yadav , 51008584 Pushpendra Pal , 51010202 |
We had added method for outer shield detection only hence it was difficult to judge for inner shield shift. | Now we have implemented the 3d height method for inner shield detection at Post AOI on base of PCB outing the shield, and validated the same and found feasible for inner shield shift detection | 12/2025 | ||
| 2 | LCIK - 39358 |
Productivity Improvement |
Rajat Kumar , 51009439 |
RAJNEESH SEN , 45011 |
Before during Preventive maintenance of Reflow machine no checkpoint for checking heater resistance of all zones. | Now we checked resistance of all top 7 bottom heater resistance in quarterly preventive Maintenance . this prevent any sudden breakdown due to week strength in resistivity. | 12/2023 | ||
| 3 | LCIK - 43454 |
Productivity Improvement |
Vikas Rawat , 51010697 |
Pushpendra Pal , 51010202 Vikas kumar prajapati , 51009930 |
we are facing BGA IC Part shifting issue due to Vacuum leakage with normal nozzle due to part pick up surface is metallic. First time we are using this type of component in 5G. | Now Part moved from mounter 7 to 6 and add Special Nozzle 185N with rubber tip to stable pickup position and also given detection at Pre AOI as well as validation the result found improved. | 12/2025 | ||
| Previous 714 715 716 717 718 Next | |||||||||