Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 39861 |
Productivity Improvement |
Anoop kumar tiwari , 51009703 |
Mulyam Singh Yadav , 82497 |
Before we are facing bridging issue on connector bottom side due to tooling fitment issue with pallet and pallet also drop after printing in printer due to tooling. | After rubbing tooling on extra height location no issue observed till now. | 03/2024 | ||
| 2 | LCIK - 39097 |
Productivity Improvement |
Yashbir , 51008101 |
Sanket , 51009008 Akhilesh yadav , 51008584 |
226 Nozzle reflector of Panasonic mounters separate out from nozzle assembly and it gets NG for machine use. | After,we paste reflector with gum solvent and keep it for 24 hours it gets ok.,Its saves one nozzle 226 cost | 10/2023 | ||
| 3 | LCIK - 40889 |
Productivity Improvement |
Anurag Shukla , 51009676 |
Krishna Puri , 166868 |
In yuva3 main model top side pallet 2 side less space between pcba & pallet. Due to this side component dry soldering issue comming. This position covered by pallet inside rib. which this issue coming. | Now we modify the pallet at this position. Due to this component dry soldering issue problem solve. And no issue coming related this. | 06/2024 | ||
| Previous 711 712 713 714 715 Next | |||||||||