Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 39856 |
Productivity Improvement |
Sanket , 51009008 |
Shubham chand boudai , 51010132 Yashbir , 51008101 |
Model Blaze curve are facing connector shorting issue because PCB have not support at palate,during print excess and bridge issue at connector location. | we update vacuum tooling, all location have support block for connector. | 03/2024 | ||
| 2 | LCIK - 39345 |
productivity improvement |
Sachin yadav , 51009625 |
12/2023 | |||||
| 3 | LCIK - 39857 |
Productivity Improvement |
Sanket , 51009008 |
, 51009929 Akhilesh yadav , 51008584 |
Previously we were facing warpage issue on printer top side after reflow bottom side pcb due to this facing dry solder , low volume & shorting issue on line. | Now we are using pallet fixture on bottom side and remove dowell pin from bottom pallet to reduce the pcb shrinkage issue so we get better result on printer and reduce smt failure also | 03/2024 | ||
| Previous 709 710 711 712 713 Next | |||||||||