Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 43653 |
Productivity improvement |
SOMSHANKAR PATEL , 51009707 |
Laser marking was done on the charger PCB The laser marking process required extra time It created a bottleneck in the production line Overall production output was low | By removing the laser marking process from the charger PCB, production efficiency improved significantly and overall output increased due to elimination of unnecessary operations. Extra laser marking time was eliminated Production line ran smoothly Production output increased significantly | 01/2026 | |||
| 2 | LCIK - 37254 |
Productivity Improvement |
, 51009680 |
MO RASHID , 44556 |
11/2022 | ||||
| 3 | LCIK - 37766 |
Productivity Improvement |
Prabhat kumar kushwaha , 51009705 |
Before,In line 04 before printer we are using 0.5metre conveyor due to this one Pallet can be hold and during magazine change printer stands in waiting and loss of production. | Now, we changed 0.5metre to 1meter link conveyor after loader and before printer.It keeps 3 Booards with pallets in waiting which continue feeding to printer and no loss during magazine change. | 01/2023 | |||