Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 41052 |
Productivity Improvement |
Krishna Puri , 166868 |
Mulyam Singh Yadav , 82497 |
splicing tool one pin broken due to this tools is ng which sometimes production hampered. And production team facing issue related to splicing. | Now we repaired tool , pin and install it due to this splicing tool working ok. | 07/2024 | ||
| 2 | LCIK - 41308 |
Productivity Improvement |
Akbar Ali , 51010494 |
There is no line cable connection in the vendor room on 3rd floor due to which sap does not work in the IQC system and for booking the vendor part the IQC person has to come to the 1st floor Due to which the does not book vendor part on time and it takes time to fill the recco in the last hour. | If line cable connection is installed in the vendor room or a system with wifi is provided for the vendor room, the vendor will be booked on part time and there will be no problem in filling the line records. | 08/2024 | |||
| 3 | LCIK - 39521 |
Productivity Improvement |
Anurag Shukla , 51009676 |
Rajneesh Sen , 80744 |
Before during feeder loading the connector cables used to get stretched due to which the cable's connector got damaged. | 01/2024 | |||