Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 39296 |
Vitrox Post AOI inspection time issue and bottleneck |
Vikas kumar prajapati , 51009930 |
Shubham chand boudai , 51010132 Yashbir , 51008101 |
12/2023 | ||||
| 2 | LCIK - 38718 |
VISUAL PROCESS BEFOR GLUE |
Ashish Kr Singh , 55586 |
Kartik Rautela , 55955 , 40004 |
EARLIER WE HAVE VISUAL DONE AFTER GLUE PROCESS . AFTER GLUE DONE USB UPLIFT NOT VISIBLE SO FAILURE SKIP FROM OPERATOR & FOUND IN ASSEMBLY . | NOW PROCESS CHANGE & VISUAL DONE BEFOR GLUE AT POST AOI . NOW DEFECT CONTROL FOR USB UPLIFT IN ASSEMBLY . | 06/2023 | ||
| 3 | LCIK - 38785 |
Visual method changed . |
Subhash chandra yadav , 51008656 |
Pawan Kumar Yadav , 51010085 Firasat ali , 51008645 |
Earlier we are doing only top side visual of Sub PCBA USB jack .Due to huge chances of skipage USB uplift issue. | Now we started both side(top & bottom) visual inspection of Sub PCBA USB jack in model Yuva 2 PRO.After that controlled USB jack uplift issue | 06/2023 | ||
| Previous 67 68 69 70 71 Next | |||||||||