Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 41509 |
Productivity Improvement |
Sumit , 51009949 |
We were facing shortage Of 2.5 MM screw for RF Fixture and need some serial cable connector for Weight Machine. We had old Current Jig of Nokia EOL Model. Which was not in use. | Now we have removed needy parts from them and using for Fixed the RF Fixture and repairing for RF cable. | 09/2024 | |||
| 2 | LCIK - 41767 |
Productivity Improvement |
Krishna Kumar Singh , 51010395 |
In YUVA 5G model 100% OQA inspection is going on due to which there is a shortage of back cover online | Now we are using blaze 2 5G back cover in YUVA 5G during oqa inspection because blaze 2 5G and YUVA 5G back cover are similar. due to this no shortage of back cover will happened. | 11/2024 | |||
| 3 | LCIK - 40488 |
Productivity improvement |
Firasat ali , 51008645 |
Mohan Kumar , 45381 AMIT KUMAR SAHOO , 44803 |
Earlier our DGS did not have grounding, due to which we used to face ESD problems. because we used to keep the droppage part on the defined place on the DGS due to which we used to face NC while auditing. | 05/2024 | |||
| Previous 678 679 680 681 682 Next | |||||||||